We traveled from St. Louis to the Wallops Flight Facility on Oct. 31, 2021 to integrate the X- ray polarimeter and shield into the telescope and gondola. The integration will take three weeks. The first week focuses in mounting the detector and shield and testing their functionality. The second week will focus on the computer communication between https://en.m.wikipedia.org/wiki/Wallops_Flight_Facility#/media/File%3ANASA_Wallops_Flight_Facility%2C_2010.jpgthe data acquisition system and the pointing system as well as on the mirror-detector alignment. Week three will be dedicated to pointing tests.
