Skip to content
Skip to search
Skip to footer
- Continued CAD model iterations for the vessels and began developing a system to hold the vessels and mirror for two plain viewing of the injection.
- Acquired Mike’s approval on the injection for each of the vessels, the tube connections, and the two plain viewing system.
- Practiced soldering for the permanent set up for the temperature sensor. The motor circuit is built along with the code, but the motor driver is faulty and will need a replacement. Once everything is working, the tubing systems can be built.
- Paul, Gabriella, and Alyssa met at UN&UP on 3/31 to check on 3D prints and work on the circuitry for the pump.