Attendees: Gabriella, Paul, Alyssa

2/14/22

  • Started working on the V&V report
  • Decided on individual roles
  • Updated the design specifications

Met on 2/17/22 to go to UN&UP. 

  • Installed and configured a raspberry pi with our system
  • Configured our webcam with the raspberry pi
  • Decided which silicone tubes that we are using 
  • Made a list of future parts we need
  • Decided how we are setting up the box around the tubing system
  • Obtained fluid tight ports from UN&UP
  • Planned out what we are doing next week before we meet again at UN&UP