Attendees: Gabriella, Paul, Alyssa
2/14/22
- Started working on the V&V report
- Decided on individual roles
- Updated the design specifications
Met on 2/17/22 to go to UN&UP.
- Installed and configured a raspberry pi with our system
- Configured our webcam with the raspberry pi
- Decided which silicone tubes that we are using
- Made a list of future parts we need
- Decided how we are setting up the box around the tubing system
- Obtained fluid tight ports from UN&UP
- Planned out what we are doing next week before we meet again at UN&UP