Printed PCB Illustration:
The basic information of the PCB board
Basic Tests to the Board Operated
Parts/Functions | Status | Working? | Method |
Battery Indicator | Tested | Yes | Signal Generator & Multimeter |
Power Regulator (3.7V output) | Tested | Yes | Multimeter |
MUX | Tested | Yes | Pi Board |
PWM A(Connects the servo motors) | Tested | Yes | Servo Motors & Pi board |
*PWM B (Connects the ESC) | Not tested | — | Tested with the switch |
*Switch (Connects the remote controller) | Not tested | — | See if changes the controlling of the motor |
Update Log
Version | Time of Design Finished | Time Received | Time Tested | Problems |
1 | 12/12/2020 | 12/2302/2/ | 1/3/2020 | 1. There are wiring problems on the PWM B 2. The manufacturing/soldering of the board is not well enough that the soldering pad falls off 3. The chose of the power regulator chip version was wrong |
2 | 1/3/2020 | *1/11/2021 | — | 1. The ports designed for line tracking sensors were wrong |
3 | — | — | — |
Bill of Materials and Soldering Positions (for special parts)